End User: LinkLaters
Project Manager / Contractor: T Clarke Plc/Chapman Bathurst Partnership
Project: Milton House
Equipment: XS 1000K open set, acoustic enclosure, 65 dBa @ 1m free field between bulk tank in basement and roof.
1 x XS1000kVA standby LV diesel generating set G3 installed on Roof Level 16 arranged for automatic start from receipt of remote start signals and serving TP5 & TP6.
The generator is housed within an acoustic enclosure designed to reduce noise levels to 65dBA @ 1m free-field. The generator is fed from an adjacent 1200 litre daily service tank installed within a 4-hour fire rated enclosure. Fuel to the daily service tank is supplied from an existing 20,000 litre bulk fuel tank on the Mezzanine Floor via a new AVK fully automatic duplex fuel transfer pump system.