End User: University Hospital Lewisham
Project Manager / Contractor: Lorne Stewart
Project: Automatic Switch Centre
Equipment: 1 x 1000kVA containerised generator
AVK recently supplied a containerised 1000kVA generator to the new block at Lewisham Hospital. The generator was mounted on the roof and part of the design was to isolate the generator so that any vibration during the operation didn’t penetrate down into the wards below. This was achieved using layers of sound absorption material within the concrete slab base.
Once the design was verified by the Sound Consultant, the construction took place. Getting the generator into position was a major task. Neither of the site cranes were able to lift the generator into position. Therefore, the generator was lifted onto the roof and positioned into place using bridging steels and skates.
The local fuel tank was fed from the main bulk tank on the site. However, the local tank was designed to hold twice the normal amount of fuel. AVK designed and constructed a 4-hour rated fire proof tank which hopefully will allow the patients to sleep peacefully.
To find out more about AVK control systems or generators please contact us on 01628 503900 or visit our website www.avk-seg.co.uk