Barclays Capital

 

End User: Barclays
Project Manager / Contractor: Hurley Palmer Flatt/Wates
Project: Northolt Phase 2
Equipment: 4 off 2000kVA prime rated generating sets with 40 foot ISO containers, radiators & exhaust silencers Kerys control panels

When Barclays Capital engaged in Phase 2 of the Northolt site their intention of working with AVK was clear from the beginning. Before selecting their main contractor they insisted they enter into a formal agreement with AVK to provide the generator package.

AVK provided Barclays with a repeat mirror image of the original project (Phase 1) based upon 4 off 2000kVA prime rated generating sets each installed within 40ft ISO containers with attenuation to 69dBA @ 1 metre. Complete with roof-mounted horizontal radiators and exhaust silencers. Free-standing Kerys control and synchronising panels were fitted, with testing of the switchgear organised at works. All four generators were lifted one by one from the road-side, over the fencing and strategically placed onto the base units.

All four generators are covered by AVK’s Premium Maintenance Service which consists of two maintenance visits a year. Load bank testing during a minor service. The maintenance also provides a 24 hour 7 days a week call-out facility. This cover garauntees if needed, one of our engineers to be on-site within 4 hours of Barclays' call.