Case Study - T Mobile

Client:T Mobile
Project:Automatic Switch Centre
Market:Telecommunications
Date:July 2004
Equipment:2x825kVA Generators configured N+N with short term synch with the mains
T Mobile selected AVK|SEG (UK) LTD Power Solutions Providers to supply Standby Generation.  This fast track Project was initiated from a requirement to enhance the capability within one of T Mobile Switch Centres.

The system provided by AVK|SEG (UK) LTD consisted of 2 x 825kVA Generators  required to be located in the existing building  in a ‘shoe horn’ fashion  due to the height restriction of the premises.    In addition the Generator Control Panel was located in a separate area of the building.   Installation was carried out of a 30000 litre underground storage tank together with 2 x 1000 litre day tanks with transfer system.

Room attenuation was to meet 65dba at the site boundary and a separate ventilation fan  was installed for temperature control set at 25 degrees centigrade. An SEG G59 Relay was fitted in the LV Switchboard as was a new Kerys controller.

This AVK|SEG (UK) LTD installation is in addition to previous projects as follows:-

T Mobile Corporate offices in Hatfield, Hertofrdshire – 2 x 375kVA Containerised Generators.

T Mobile Switch Centre,

Warwick Road, Borehamwood – 1400kVA Open Set.

T Mobile Croydon – 500kVA Containerised Generator

Click here to view our other case studies





Search Site
Products & Services

Uninterruptible Power Supplies
Standby Generators
Generator Hire
Protection Relays
Turnkey Power Solutions
Switch Gear

Recruitment
Click here for career opportunities with AVK | SEG (UK)

Client Testimonals.